Switching the System On/Off
12.2
System with Compact Supply Unit
The sequence below describes how the components of the system must be switched on/off
with a compact supply unit.
12.2.1
Switch-on Sequence
1
2
3
4
5
6
7
76
Observe the user manuals for external lasers
Please refer to the information from the documents provided by the laser
manufacturer for the external lasers. Pay particular attention to the laser
manufacturer's notes!
If you are using an EL6000 fluorescence lamp, switch it on.
If you are using a HyD RLD, switch it on at its supply unit.
You can find additional information on the HyD RLD in
Chapter 12.3
Workstation
Switch on the workstation. The operating system starts
automatically. Wait until the startup process has concluded.
Turn on the microscope by actuating the toggle switch on
the electronics box. The microscope is operational once the
readiness indicator on the toggle switch is lit up.
If your system has an infrared laser (MP) or an optical
parametric oscillator (OPO), switch on the NDD detection
unit.
Switch on the scan head on the front side of the compact
supply unit.
Switch on the lasers on the front side of the compact supply
unit.
The power supplies and fan of the system have now been
started.