Test Basic Link Operation; Mounting The Access Point; Figure 28 Square Mounting Bracket Attaches To Bottom Of Oap180 - Meru Networks AP320 Installation Manual

Access point and radio switch
Table of Contents

Advertisement

Grounding
It is important that the OAP180, cables, and any supporting structures are properly
grounded. The OAP180 unit includes a grounding screw to attach a ground wire. Be sure
that grounding is available and that it meets local and national electrical codes.

Test Basic Link Operation

Set up the OAP180 on the ground, either outdoors or indoors. Connect the unit as indi-
cated in this document and perform the basic configuration tasks outlined below.
When you are satisfied that the OAP180 is operating correctly, proceed to mounting the
unit in the intended location.

Mounting the Access Point

The OAP180 can be mounted on the following (brackets are included):
1.5 to 2 inch diameter pole
Wall
Mounting OAP180 with the Pole-Mounting Bracket
Follow these steps to mount the unit to a 1.5 to 2 inch diameter steel pole or tube using
the mounting bracket:
1. Attach the OAP180 to the mounting bracket.
Figure 28: Square Mounting Bracket Attaches to Bottom of OAP180
2. Place the V-shaped part of the bracket around the pole and tighten the securing nuts
© 2008 Meru Networks, Inc.
Attach the adjustable
rectangular plate to
the bridge with
supplied screws
just enough to hold the bracket to the pole. (The bracket may need to be rotated
around the pole during the alignment process.)
Installing the Access Points
Installing the OAP180
49

Advertisement

Table of Contents
loading

Table of Contents