Figure 21 Mounting The Ap200 Above A Suspended Ceiling; Figure 22 Box Hanger Mounting Bracket Holes - Meru Networks AP320 Installation Manual

Access point and radio switch
Table of Contents

Advertisement

Installing the Access Points
Warning! Any Fast Ethernet (FE) cables installed in air-handling spaces should be
suitable under NEC Article 800.50 and marked accordingly for use in plenums and air-
handling spaces with regard to smoke propagation, such as CL2-P, CL3-P, MPP (Multi
Purpose Plenum), or CMP (Communications Plenum).
Figure 21: Mounting the AP200 Above a Suspended Ceiling
To mount an AP200 above suspended ceiling rails:
1. Determine the location on the ceiling rails where the AP will be mounted and
2. Unpack the T-bar hanger kit and unfold the legs of the T-bar hanger.
3. Locate the bracket mounting clip holes on the mounting bracket (see
Figure 22: Box Hanger Mounting Bracket Holes
38
Meru Access Point and Radio Switch Installation Guide
Height adjustment screw
Access Point 200
T-rail clips
Suspended ceiling T-rail
remove the ceiling tile.
One hole attaches the bracket perpendicular to the box hanger; the other mounts
the bracket parallel to the box hanger.
Mounting bracket holes
Bracket mounting clip
Mounting bracket
T-bar hanger
Antennas
Height adjustment screw
Figure
22).
© 2008 Meru Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents