Installation Manual – RPSP
6 Final Checks and Verifications
All verifications indicated in the end of installation list contained below must be carried out prior to
issuance of the machine. The test list in the customer user manual must be filled out and signed
by the installer.
Failure to perform final testing can compromise system operation and terms of the warranty.
Ref. Test
1
Guide and anchor tests
2
Strip test
3
Safety bar test
4
Speed limiter and overspeed governor test
5
Operational checks
6
Safety device check
7
Stop distance check
resulting in the interruption of the run command (mm)
8
Manual emergency manoeuvre check
9
Any observations
System Serial Number
Test Date
Signature of technician (legible)
Installation Company
Maximum guide rotation in degrees (°)
Guide residual deformation (mm)
Strip deformation under load (mm)
Deformation under vertical load (mm)
Deformation under horizontal load (mm)
for safety intervention (mm)
53
INS-RPSP-EN-05
RESULT
Positive
Negative
-
-
-
-
-
-
-
-
Value
-
-
-
-
-
-
-
-