Installation Manual – RPSP
Using
a
pencil
(alternatively a stanchion as a line and
a level or a very long level can be
used), mark the position of the upper
and lower holes for the stanchions just
positioned (Fig. 17 e Fig. 18) that
correspond to the V notches on the rail.
The notches are on both parts of the
rail.
Caution! The holes must be properly aligned on the vertical.
At this point the 8.5 mm holes can be
drilled where the marks had just been
made.
Continue as above for the remaining
stanchions.
and
plumb
line
Fig. 17 – Various methods of marking the holes
Fig. 18 – Detail of drilling hole marks
19
INS-RPSP-EN-05