Adaptec 5325302057 User Manual page 199

Snap server 750i nas
Table of Contents

Advertisement

Snap Server 720i Hardware Checklist
The following checklist shows the required and optional hardware to install a Snap
Server 720i, and indicates whether a component comes with the server or must be
supplied by the customer.
Component
Description
Network and
Ethernet Cables (3 per enclosure)
Power
Required to connect the Ethernet port(s) to the network.
Power Cables (3 per enclosure)
Required to plug into the mains (1 US, 1 UK, 1 EU).
Ethernet Switches
Use switches that support GbE.
APC-Brand UPS Device(s) (optional)
Snap Servers are designed to work with a USB-based or network-
based APC-brand UPS. Visit the
APC models.
Rack
Slide Rail Assemblies (2 per enclosure)
Two (2) slide rails and screws for attaching the server to a rack.
32 inch/36 inch, Four-post Rack
You must use a 32-inch (or greater) four-post rack to mount this server.
Expansion
SAS Card
Required to connect to an S50 expansion array.
Snap Server and Expansion Array Hardware Checklists
APC Web site
Appendix C Your Snap Server 700i Series
for a listing of optimal
193

Advertisement

Table of Contents
loading

Table of Contents