Measurement Preparations; Turn On The Instrument; Navigation In The Menu - Ecom EN3 Instruction Manual

Intelligent analysis
Hide thumbs Also See for ecom EN3:
Table of Contents

Advertisement

2. Measurement Preparations

NOTE
Make sure that before each measurement:
the device has no visible defects
the measuring system is tight (see chapter leak test)

2.1. Turn on the instrument

The instrument is switched on with the <I / 0> key.
NOTE
After switching on the instrument or before starting a measurement,
check the charging status of the battery. Check the charging status of
the battery in the status line and / or in the menu "Control".
The instrument is supplied with charging power supply. The instrument can
also be operated with the internal battery for an extended period of time.
When recharging the battery is necessary, the instrument will emit a battery
warning. This is done acoustically and via a message in the display.
NOTE
The battery warning is activated when the battery voltage is less than
6.5 V. Less than 6.0 V the operation with battery is no longer possi-
ble. The operation must continue via the charging power supply.

2.2. Navigation in the menu

When the instrument is switched on, the start screen is displayed, followed
by the main menu.
Gas analysis
Soot..Oil trace
Data processing
Adjustments
Control
Diagnostics
ecom-EN3
Up to 5 submenus are displayed simultane-
ously in the main menu. Hidden submenus can
be displayed by scrolling with the arrow keys.
Page 17

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ecom EN3 and is the answer not in the manual?

Questions and answers

Table of Contents