Transportation
3.1.1
Adequate load handling devices must be used to transport the robot. Make sure that the
robot is lifted as shown in the diagram "Transport by crane".
1
Wire rope (at least 1200 mm
long)
2
Shipping brackets and bolts
3
2 screws M12 x 30, 2 washers
M12 and 2 spring washers
M12
4
The position of the center of
gravity:
All dimensions in mm

Using a crane

Transport with crane
266
346
1162
718
-