Maintenance and inspection
9.1
Proper inspections are essential not only to assure that the mechanism will be able to
function for a long period. But also to prevent malfunctions and assure safe operation.
Inspection are classified into several time levels as shown by the following table „Inspection
intervals".
In the table of „Inspection intervals", the inspections are divided according to three levels of
requirement:
Works, carried out by trained staff.
Work carried out by staff trained by YASKAWA.
Works, carried out by YASKAWA staff.
Inspections are only carried out by trained staff.
NOTICE
 The inspection intervals depend on the SERVO power time (see point 1 in ).
 The table „Inspection intervals" applies to normal cases.
 Deviations are to be determined by the TCS service department of YEU-R.
-
9
48

Inspection schedule

DATA
EDIT
DISPLAY
UTILITY
SYS MONITORING TIME
CONTROL POWER TIME (2017/07/06 10:00
)
2385:42'02
SERVO POWER TIME
(2017/07/06 10:30
)
36000:00'00
PLAYBACK TIME
(2017/05/22 11:12
)
2210:00'20
MOVING TIME
(2017/05/22 15:30
)
1875:15'30
OPERATING TIME
(2017/05/22 16:12
)
0:0'0
Main Menu
ShortCut
Fig. 9-1: SERVO power time
DATA
EDIT
DISPLAY
UTILITY
SYS MONITORING TIME
CONTROL POWER TIME (2017/07/06 10:00
)
2385:42'02
SERVO POWER TIME
(2017/07/06 10:30
)
36000:00'00
PLAYBACK TIME
(2017/05/22 11:12
)
2210:00'20
MOVING TIME
(2017/05/22 15:30
)
1875:15'30
OPERATING TIME
(2017/05/22 16:12
)
0:0'0
Main Menu
ShortCut

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gp25-12

Table of Contents