GE LOGIQ V3 Basic Service Manual page 131

Hide thumbs Also See for LOGIQ V3:
Table of Contents

Advertisement

4-2-2-3 Switch ON the AC Power to LOGIQ V3/V5/V5 Expert
NOTE:
LOGIQ V3/V5/V5 Expert – Basic Service Manual
5726264-100 English Rev.8
1. Switch ON the Mains Power Circuit Breaker at the rear of
the unit.
You should hear a "click" from the relays in the AC Power
and the unit is ready to boot.
2. Press once on the On/Off key on the Operator Panel to boot
the unit.
During a normal boot, you may observe that:
a. The unit's ventilation fan starts on full speed, but slows
down after a few seconds (listen to the fan sound).
b. Power is distributed to the peripherals, Operator Panel
(Console), Monitor, Front End Processor and Back End
Processor.
c. Back End Processor and rest of scanner starts with the
sequence listed in the next steps:
d. Back End Processor is turned ON and starts to load the
software.
e. The Start Screen is displayed on the monitor.
f.
A start-up bar indicating the time used for software
loading, is displayed on the monitor.
g. The software initiates and sets up the Front End
electronics and the rest of the instrument.
h. The backlight in the keyboard is lit.
i.
As soon as the software has been loaded, either a 2D
screen is displayed on the screen, indicating that a
probe has been connected, or a No Mode screen is
displayed, indicating that no probe has been connected.
Total time used for start-up is typical one and a half
minutes or less. If starting after a power loss or a
lock-up, the start-up time may be up to four minutes.
General procedures
4-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logiq v5Logiq v5 expertH48612aaH48612abH48612ac

Table of Contents