Time and Manpower Requirements
Site preparation takes time. Begin site preparation checks as soon as possible, if possible, six weeks
before delivery, to allow enough time to make any changes.
FOR CONSOLE ULTRASOUND SYSTEMS AND FOR ULTRASOUND SYSTEMS