P R E L I M I N A R Y
D
5813707-100, R
IRECTION
8-2-10-5
C-FEB Installation Procedure
1.) Connect the metal bracket to the board
2.) Install the C-FEB so that the docking connector goes inside the docking bracket on the Front
Display assembly.
3.) Secure the 10 holding screws.
4.) Route the Front Display Indicator Cable.
5.) Install the C-BEB.
•
6) Install the fan.
•
7.) Install the C-PSB.
•
8.) Install back cover.
•
8-30
2
EVISION
Figure 8-107 Removed C-FEB
C-BEB Installation Procedure
Fan Installation Procedure
C-PSB Installation Procedure
Back Cover Installation Procedure
Chapter 8 - Replacement Procedures
V
™ S
M
ENUE
ERVICE
ANUAL