Purpose Of Chapter 6 - GE Venue Go Service Manual

Table of Contents

Advertisement

P R E L I M I N A R Y
D
5813707-100, R
IRECTION
Chapter 6
Service Adjustments
Section 6-1
Overview
6-1-1

Purpose of Chapter 6

This chapter explains that there are no service adjustments required on a Venue™ .
Section 6-2
Power Supply Adjustments
There are no adjustments on the AC/DC power supply.
The AC/DC Power is self-regulated.
If a voltage is outside the specified range, it means that something is wrong, either with the power supply
itself or with one (or more) of the units connected to that specific power outlet.
When an error occurs, the power will be turned OFF immediately.
2
EVISION
Chapter 6 - Service Adjustments
V
™ S
M
ENUE
ERVICE
ANUAL
6-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

H45601vg

Table of Contents