System Power Distribution; Introduction - GE Venue Go Service Manual

Table of Contents

Advertisement

P R E L I M I N A R Y
D
5813707-100, R
IRECTION
Section 5-8

System Power Distribution

5-8-1

Introduction

The AC/DC adapter is the main Power Supply for the Venue Go™System. It provides the DC voltage
required to power the system in all its operational modes, while providing power to charge its two
internal Li-Ion batteries. The AC/DC adapter also acts as the isolation barrier between the AC mains
and the System.
2
EVISION
Chapter 5 - Venue Go™Components and Function (Theory)
H
™ S
M
AWAII
ERVICE
ANUAL
5-15

Advertisement

Table of Contents
loading

This manual is also suitable for:

H45601vg

Table of Contents