3.12 Verification After Installation

Table
installation. Record results in the table after verification.
Table 3-17 Check items on the cabinet installation
Check Item
Cabinet
LCD
Electric heater
Fan
Electrode
humidifier
Wet film
humidifier
Issue 15 (2020-12-10)
NO TE
● The address of a T/H sensor provided by Huawei is 1 by default.
● The last RS485_R toggle switch remains OFF.
● After setting communications addresses for T/H sensors, choose Settings > System
Settings > T/H Sensor from the main menu and set the T/H sensor in the aisle to
Enable. Otherwise, the T/H sensor does not work.
3-17,
Table 3-18
and
Expected Result
The cabinet is installed properly,
without any tilt.
The cabinet is secured to the base
using bolts.
The foreign matter inside the cabinet
such as cable ties and stubs is
cleaned up.
The LCD is well connected.
The electric heater is secured.
The fan is secured.
The fan has no foreign matter inside.
The fan blades rotate properly.
The water inlet pipes and drainpipes
are securely connected without leaks.
The electrode humidifier is securely
connected to its base.
The water inlet solenoid valve is
secured reliably and steadily.
The humidifier water pump is secured
reliably and steadily.
The wet film is secured reliably and
steadily.
Copyright © Huawei Technologies Co., Ltd.
Table 3-19
list the items for the verification after
3 Installation Guide
Check Result
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed