Figure 4-42 Electric heater commissioning
Step 8 After the electric heater commissioning, the humidifier commissioning screen is
displayed. Verify that the main water inlet valve is open. Check whether the
humidifier pipes and the solenoid valve leak.
Figure 4-43 Humidifier commissioning
Step 9 After the humidifier commissioning, the condensate pump commissioning screen
is displayed. Check whether the condensate pump vibrates and generates
operating sound.
Issue 15 (2020-12-10)
If yes, select Leak, and tap Submit. The commissioning has failed. Locate and
repair the leak points.
If no, select No leak, and tap Submit within the time limit displayed on the
screen.
If yes, select Yes, and tap Submit within the time limit displayed on the
screen.
If no, select No, and tap Submit. The commissioning has failed. Locate and
rectify the faults of the condensate pump.