Power-On - Huawei NetCol5000-A025 User Manual

In-row air cooled smart cooling product
Hide thumbs Also See for NetCol5000-A025:
Table of Contents

Advertisement

NetCol5000-A025 In-row Air Cooled Smart Cooling
Product
User Manual (300 mm Width)

4.5.1 Power-On

Context
All switches are set to OFF before delivery. If the preset status is changed, restore
the preset status before any operation.
Procedure
Step 1 Turn on the upstream power input switch of the smart cooling product. The LCD
lights up.
Step 2 Turn on the switch QF3 that controls the outdoor unit and compressor, and switch
QF4 that controls the electric heater. (If electric heater is not configured, it is not
need to turn on the QF4.)
Step 3 After the system is powered on for the first time, the Quick Settings screen is
displayed. Log in as the admin user, as shown in
Figure 4-12 Initial power-on
Table 4-11 Preset password
User
admin
(administrator
user)
operator (common
user)
Issue 15 (2020-12-10)
Preset Password
000001
000001
Copyright © Huawei Technologies Co., Ltd.
4 Power-On Commissioning
Figure
4-12.
Permission Description
People can operate all menus.
People can only view parameter
settings and set a part of
parameters in the menus.
125

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents