Huawei NetCol5000-A025 User Manual page 253

In-row air cooled smart cooling product
Hide thumbs Also See for NetCol5000-A025:
Table of Contents

Advertisement

NetCol5000-A025 In-row Air Cooled Smart Cooling
Product
User Manual (300 mm Width)
Figure 6-16 Installing a threaded filter dryer
1.
2.
3.
4.
5.
6.
Step 6 Reinstall the liquid pipe NTC temperature sensor.
Step 7 Perform a leakage test with nitrogen again.
Issue 15 (2020-12-10)
Weld the entrance of the removed sight glass to the straight tube (with a
thread connector) at the exit of the filter dryer.
Weld the assembly of the sight glass and exit straight tube of the filter dryer
to the original position in the smart cooling product. Install the sight glass at
a proper angle and make the glass surface face outwards so that you can
observe the sight glass from the rear door.
Weld the entrance elbow (with a thread connector) of the filter dryer to the
smart cooling product.
Remove the plastic plug from the port of the new filter dryer.
Apply red glue to the third to second last thread circles of the outer screw
thread counting from the pipe outlet inward. Use two 27# adjustable
wrenches to secure the filter dryer nut and pipe nut, respectively. Then use a
36# adjustable wrench to tighten the adjustable nut.
Reinstall the hold hoop and pipe clamp.
Copyright © Huawei Technologies Co., Ltd.
6 System Operation and Maintenance
243

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents