NetCol5000-A025 In-row Air Cooled Smart Cooling
Product
User Manual (300 mm Width)
----End
Issue 15 (2020-12-10)
Figure 4-46 Commissioning successfully
Figure 4-47
is displayed if component commissioning fails, which ends
startup wizard commissioning.
Figure 4-47 Commissioning unsuccessfully
NO TE
– If commissioning fails, tap Commissioning failed. In
details, as shown in
– After the fault is cleared, choose Maint > Wizard Startup to enter the wizard
startup screen for new commissioning.
Figure 4-48 Details of failure
Copyright © Huawei Technologies Co., Ltd.
Figure
4-48.
4 Power-On Commissioning
Figure 4-47
to view the