Preparation Of The Calibration Test Equipment - Arjohuntleigh FLOWTRON UNIVERSAL Service Manual

Hide thumbs Also See for FLOWTRON UNIVERSAL:
Table of Contents

Advertisement

Testing
5.2.2
Press the Up
5.3
To select the highlighted option on the LCD (the relevant text is shown inverted i.e. white text on
a black background), press the Select
Selected Option
Press to scroll down
6

Preparation of the Calibration Test Equipment

6.1
Use a standard foot garment (Fig 21, Item 10) as part of the test equipment.
6.2
Find the approximate position of the middle of the foot garment tube, and using a sharp knife,
cut the foot garment tube in two.
6.3
Insert a T-connector (Fig 21, Item 30) into the two cut ends of the foot garment tube.
6.4
Insert the remaining port on the T-connector into the tube connected to the calibrated pressure
meter (Fig 21, Item 20).
Chap 4
Page 6
icon to scroll up.
button below the LCD display.
Press to scroll up
Figure 20 - LCD Display - Calibrate RFID
SER0009
Flowtron Universal Service Manual
LCD Display
"Normal" User Buttons
Press to select the option
Issue 2
Sep 2009

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents