Replacing The Front Case - Arjohuntleigh FLOWTRON UNIVERSAL Service Manual

Hide thumbs Also See for FLOWTRON UNIVERSAL:
Table of Contents

Advertisement

Flowtron Universal Service Manual
41

Replacing the Front Case

41.1
Separate the top case assembly from the front case (Refer to Page 15, Section 14).
41.2
Remove the power supply PCB assembly, compressor assembly and mounting bracket from the
pump (Refer to Page 31, Section 26).
41.3
Lay the new front case (Fig 63, Item 10) down with the inside surface pointing upwards.
41.4
Stick the following parts to the front case:
41.4.1
The two compressor support rubbers (Fig 63, Item 20).
41.4.2
The connector sealing strip (Fig 63, Item 50), adjacent to the battery pack connector
slot.
41.4.3
The magnet mounting pad (Fig 63, Item 40) onto the front case, in the appropriate slot.
41.4.4
The ferrite magnet (Fig 63, Item 30) onto the ferrite mounting pad.
Note: Make sure the ferrite magnet and magnet mounting pad are aligned with the
sides of the slot in the front case.
41.5
Install the power supply PCB assembly, compressor assembly and mounting bracket onto the
pump (Refer to Page 31, Section 27).
41.6
Install the top case assembly onto the front case (Refer to Page 16, Section 15).
Issue 2
Sep 2009
SER0009
Pump Repair
Chap 5
Page 49

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents