Prepare For Specimen Installation - MTS Systems Landmark 370 Series Operation

Test system
Hide thumbs Also See for Landmark 370 Series:
Table of Contents

Advertisement

3. Prepare to Run the Test
A.
"Perform Basic Performance Tuning"
B.
"Switch to Peak Valley Meters"
C.
"Adjust Limits for the Test"
D.
"Show Station Manager Scope and Meters for the Test"
E.
"Minimize Station Manager"
4. Run the Test
A.
"Open the MPX Application"
B.
"Select the Test"
C.
"If Necessary, Correct Any Resource Errors"
D.
"Create a New Test Run"
E.
"Run the Test"
F.
"Review the Results"
G.
"Generate a Report"
H.
"Save the Test and Minimize MPX"
5. Remove the Specimen
A.
"Remove Displacement Limits"
B.
"Switch to Running Max/Min Displacement and Force Meters"
C.
"If Appropriate, Remove the Intact Specimen"
D.
"If Appropriate, Remove the Broken Specimen"
6. Recover from a Tripped Limit
A.
"If Necessary, Recover from a Tripped Force Limit"
B.
"If Necessary, Recover from a Tripped Displacement Limit"

Prepare for Specimen Installation

Preparing for specimen installation consists of the following tasks:
1.
"Turn on the Station"
2.
"Open the Station Manager Application"
3.
"Verify Calibration Files"
4.
"Set Up Meters for Specimen Installation"
5.
"Set Limits for Specimen Installation"
6.
"Zero the Force Signal"
7.
"Set Initial Tuning Parameters"
Landmark™ Test System Operation
on page 88
on page 90
on page 92
on page 94
on page 94
on page 95
on page 97
on page 98
on page 99
on page 100
on page 101
on page 58
on page 58
on page 60
on page 61
on page 64
on page 66
on page 67
Running the Example HCF Test
on page 79
on page 91
on page 95
on page 102
on page 105
on page 107
on page 110
on page 101
57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents