7 Quality control (stud welding)

7.1

General

Provided that the SOYER stud welding system is properly used and the materials are appropriately
selected, the strength of the welding joint (welding zone) will always be stronger than that of the stud
or base material.
The following tests are carried out in general practice:
•Visual inspection
•Bend test
Please also refer to the following standard
• DIN EN ISO 14555
or DVS information sheets
• DVS 0902
Drawn arc stud welding
• DVS 0904
Practical information – Arc stud welding
7.2

Demands on the company

The company must employ a technical supervisor responsible for welding matters, as well as qualified
operating personnel for stud welding.
7.3

Test execution

7.3.1

Production of samples

The dimensions of the test piece must be sufficient to carry out all tests. The thickness of the test
piece must be the same as used in later production. Use the same welding positions and edge
distances as on the component to be welded later. If it is possible and sensible from an economical
point of view, use parts that are identical to those used in later production.
Comply with the minimum sheet thickness as per DIN EN ISO 14 555.