PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Setting switches
Set the following switches.
• IP address setting switch ( Page 23 IP address setting switch setting)
• MODE switch ( Page 25 MODE switch setting)
2.
Mounting the module
Mount the NZ2AW1GNAL on the DIN rail.
Page 30 Mounting a module on a DIN rail
3.
Wiring
Wire the power supply, Ethernet cables, slave modules, and a terminating unit to the NZ2AW1GNAL.
Page 37 Supplying Power to the NZ2AW1GNAL
Page 30 CC-Link IE TSN Connector Wiring
Page 35 Connecting Slave Module or Terminating Unit
4.
Checking system before power-on
Check the system before power-on.
Page 38 Checking System Before Power-on
5.
Powering on the system
Power on and start the system in the order shown below. ( Page 39 Powering on the System)
• Power on the 24VDC external power supply for the AnyWireASLINK system.
• Power on the NZ2AW1GNAL.
• Power on the CPU module.
6.
Setting parameters
Set the parameters.
• Parameter setting ( Page 41 Parameter Setting)
• AnyWireASLINK slave module setting ( Page 48 Settings of Slave Module)
• Automatic address detection ( Page 53 Automatic Address Detection Function)
7.
Programming
Create a program.
Page 83 PROGRAMMING
3 PROCEDURES BEFORE OPERATION