Assemble The Flow Cell - Swann AMI Phosphate-II Operator's Manual

Hide thumbs Also See for AMI Phosphate-II:
Table of Contents

Advertisement

AMI Phosphate-II
Maintenance
6.9.2
48

Assemble the Flow Cell

Level
1 Replace all gaskets [D] before reassembling the flow cell.
Note: A film of teflon paste (e.g. Fomblin from Solvay Solexis)
on the gaskets improves tightness and life time.
2 Push the overflow tube [B] through the flow cell block as far as it
reaches the drain.
3 Install the outer tube [C] onto the flow cell block.
4 Put the cover onto the constant head.
5 Align the overflow tube with the upper level mark
A
B
A
C
D
E
B
F
C
D
E
F
Constant head cover
Overflow tube
Outer tube
Gaskets
Flow cell block
Flow regulating valve
A-96.250.641 / 290121

Advertisement

Table of Contents
loading

Table of Contents