Swann AMI Phosphate-II Operator's Manual page 68

Hide thumbs Also See for AMI Phosphate-II:
Table of Contents

Advertisement

AMI Phosphate-II
Program List and Explanations
3.2 Process cal.
3.2.5
3.3 Service
3.2.1
3.2.2
3.4 Simulation
3.5 Set Time
68
Process calibration:
The Process calibration is based on a comparison measurement of
the Instrument wit an external high precision instrument, see
cess Calibration, p.
Verification: Performs a verification using the reference kit. Follow
dialog. See
Verification, p.
Fill System: Activates the reagent pump. Can be used to fill, flush or
empty the system.
To simulate a value or a relay state, select the
 alarm relay,
 relay 1/2
 signal output 1/2
with the [
] or [
Press the <Enter> key.
Change the value or state of the selected item with the [
[
] key.
Press the <Enter> key.
 The value is simulated by the relay/signal output.
Alarm Relay:
Relay 1 and 2:
Input:
Signal Output 1 and 2: Actual current in [mA].
Signal Output 3
Magnetic valve 1:
Magnetic valve 2:
At the absence of any key activities, the instrument will switch back
to normal mode after 20 min. If you quit the menu, all simulated val-
ues will be reset.
Adjust date and time.
43.
40.
] key.
Active or inactive
Active or inactive
Open or closed
If option is installed actual current in mA.
Active or inactive
Active or inactive
Pro-
] or
A-96.250.641 / 290121

Advertisement

Table of Contents
loading

Table of Contents