Installation; Installation Check List - Swann AMI Phosphate-II Operator's Manual

Hide thumbs Also See for AMI Phosphate-II:
Table of Contents

Advertisement

AMI Phosphate-II

Installation

3.
3.1.
On site require-
ments
Installation
Electrical Wiring Connect all external devices like limit switches, current loops and
Reagents
Power-up
Instrument
Setup
Run-in period
16
Installation

Installation Check List

AC variant: 100–240 VAC ( 10%), 50/60 Hz ( 5%)
DC variant: 10–36 VDC
Power consumption: 35 VA maximum.
Protective earth connection required.
Sample line with sufficient sample flow and pressure (see
ment Specification, p.
Mount the instrument in vertical position.
Display should be at eye-level.
Mount the filter, filter vessel, and constant head.
Connect the sample and waste line. See
Waste, p. 18
pumps.
Connect power cord; do NOT switch on power yet!
See
Electrical Connections, p. 19
Prepare reagents. See
– Lock the occlusion frames of the peristaltic pump.
 The peristaltic pump is ready
– Turn on the sample flow and wait until the flow cell is completely
filled.
– Switch on power.
– Start "Fill System". See
– Program all parameters for external devices (interface, recorders,
etc.).
– Program all parameters for instrument operation
– limits
– alarms
– measuring interval
Let the instrument run continuously for 1 h.
13).
Refill or replace Reagents, p. 38
Fill or Flush Reagent System, p. 31
Instru-
Connecting Sample and
A-96.250.641 / 290121

Advertisement

Table of Contents
loading

Table of Contents