Connecting Sample And Waste - Swann AMI Phosphate-II Operator's Manual

Hide thumbs Also See for AMI Phosphate-II:
Table of Contents

Advertisement

AMI Phosphate-II
Installation
3.3.
Sample inlet
Mounting of
SERTO fitting
Waste
18

Connecting Sample and Waste

Use plastic tube (FEP, PA, or PE 4 x 6 mm) to connect the sample
line.
A
B
C
D
Connect the 1/2" tubes to the nozzle of the waste funnels and place
them into an atmospheric drain of sufficient capacity.
A
C
D
B
WARNING
Health hazard
The sample in the photometer contains sulfuric acid.
 At no means recirculate it into the water system.
A
Screw connection
B
Compression ferrule
C
Knurled nut
D
Flexible tube
A
Tube from photometer
B
Waste (photometer)
C
Tube from constant head
D
Drain (constant head)
A-96.250.641 / 290121

Advertisement

Table of Contents
loading

Table of Contents