FP PostBase Vision Reference Manual page 34

Hide thumbs Also See for PostBase Vision:
Table of Contents

Advertisement

34
PostBase Vision
Connection on the franking machine
Connecting the feeder
Caution! If the feeder was previously in a
cold environment (i.e. below 10 °C / 50 °F):
Wait at least two hours after unpacking before
connecting the feeder. The feeder needs this
time to adapt to the environmental conditions.
• Connect the feeder connection cable to the
Power connection
• Plug the power cable into the power con-
• Only then plug the power cable into the
CAN-BUS interface of the franking
machine. Screw the connector on tightly.
nection for the feeder.
power outlet.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PostBase Vision and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF