24
PostBase Vision
Step 4: Connecting the PostBase Vision
• Fill sealer with SEALIT sealing fluid.
• Check the filling level. The sealer should
be filled roughly up to the 'max' mark.
• Close the filling opening with the cover.
• If necessary: Dry the sealer outside.
Note: It may take a few minutes for the fluid
to fully prepare the moistening deck and
blade.
Caution! If the PostBase Vision was previ-
ously in a cold environment (i.e. below 10 °C /
50 °F): Wait at least two hours after unpack-
ing before connecting the franking machine.
The PostBase Vision needs this time to adapt
to the environmental conditions.
Caution! Do not connect the PostBase Vision
Feeder (the optional automatic feeder) until
Step 7. The PostBase Vision franking
machine must be fully installed to do this.
Otherwise the Feeder will not be recognised
by the franking machine. The franking sys-
tem will not work.
Need help?
Do you have a question about the PostBase Vision and is the answer not in the manual?
Questions and answers