Put the safety caps back on.
Use the 340-mm-long cell connector to connect connection B- on the battery
management system (BMS) to the negative pole (-) of battery module 1 (Bat 1).
Put the safety caps back on.
The subsequent steps involve the laying of the 560-mm-long cell connectors as follows:

Illustration 24: Laying the cell connectors

Use the 560-mm-long cell connector to connect the positive pole (+) of battery
module 1 to the negative pole (-) of battery module 2.
Put the safety caps back on.
Use the 560-mm-long cell connector to connect the positive pole (+) of battery
module 2 to the negative pole (-) of battery module 3.
Put the safety caps back on.
Use the 560-mm-long cell connector to connect the positive pole (+) of battery
module 4 to the negative pole (-) of battery module 5.
Put the safety caps back on.
Use the 560-mm-long cell connector to connect the positive pole (+) of battery
module 5 to the negative pole (-) of battery module 6.
Put the safety caps back on.
Use the 560-mm-long cell connector to connect the positive pole (+) of battery
module 6 to the negative pole (-) of battery module 7.
Put the safety caps back on.
Use the 560-mm-long cell connector to connect the positive pole (+) of battery
module 7 to the negative pole (-) of battery module 8.
Put the safety caps back on.
Use the 560-mm-long cell connector to connect the positive pole (+) of battery
module 8 to the negative pole (-) of battery module 9.
Put the safety caps back on.