Earthing The Battery Storage System; Illustration 16: Securing The Foundation Earthing System; Illustration 17: Securing The Earthing System For Rack Rails - INTILION scalebloc 0.5C Operating Manual

Table of Contents

Advertisement

5.6

Earthing the battery storage system

Illustration 16: Securing the foundation earthing system

The foundation earthing system/designated earthing point in the foundation should be
secured from the inside at position (1) on the battery storage system.

Illustration 17: Securing the earthing system for rack rails

Secure the earthing system for the rack rails at position (1). To do so, pull the
earthing cable through the opening in the floor plate.
54
5.6 Earthing the battery storage system
5 Installation
INTILION GmbH

Advertisement

Table of Contents
loading

Table of Contents