Positioning The Battery Storage System Onto The Foundation And Securing In Place; Illustration 13: Technical Drawing Of The Base - INTILION scalebloc 0.5C Operating Manual

Table of Contents

Advertisement

5.5 Positioning the battery storage system onto the foundation and securing in place

5.5
Positioning the battery storage system onto the
foundation and securing in place
The following illustration shows the technical drawing of the base. This drawing can be
used to ascertain the drill measurements for the attachment of the anchors (slots). A base
template can be requested from INTILION GmbH to help with assembly.

Illustration 13: Technical drawing of the base

50
5 Installation
INTILION GmbH

Advertisement

Table of Contents
loading

Table of Contents