Illustration 23: Wiring Diagram - INTILION scalebloc 0.5C Operating Manual

Table of Contents

Advertisement

5 Installation
5.8 Power cabling of the lithium-ion batteries
Wiring diagram
DANGER
NOTE

Illustration 23: Wiring diagram

Connect the cable with the + marking shown in yellow in the diagram (bottom end) to
connection B+ on the battery management system (BMS).
Put the safety caps back on.
Connect the cable with the + marking shown in yellow in the diagram (top end) to the
positive pole (+) of battery module 9 (Bat 9).
Put the safety caps back on.
Connect the cable with the 4- marking shown in blue in the diagram (bottom end) to
the negative pole (-) of battery module 4 (Bat 4).
Put the safety caps back on.
Connect the cable with the 3+ marking shown in blue in the diagram to the positive
pole (+) of battery module 3 (Bat 3).
INTILION scalebloc 0.5C
Risk of short circuit
There is a risk to life in the event of incorrect wiring.
Never mix up the cable shown in yellow (marked with the + symbol
on both sides) with the cable shown in blue (top marking: 3+,
bottom marking: 4-).
The cables shown in the diagram running inside the central web are laid in
the floor area of the battery storage system (bottom end) or are guided out
at the top of the central web and are located between the lithium-ion
battery housings and the roof of the battery storage system (top end).