Inspection And Maintenance Work; Maintenance Intervals; Tab. 4: Maintenance Intervals - INTILION scalebloc 0.5C Operating Manual

Table of Contents

Advertisement

Carry out the following activities prior to the re-commissioning of the battery storage
system:
Carry out another check of the screw connections that were previously loosened to
make sure that they are all now securely tightened.
Check whether all previously removed protective devices such as covers have been
properly re-fitted and attached.
Make sure that all of the tools, materials and other equipment used have been
removed from the working area.
Clean the working area.
Make sure that all of the safety devices in the battery storage system are working
perfectly again.
Once all maintenance work is complete, close all doors on the battery storage system.
9.2

Inspection and maintenance work

9.2.1

Maintenance intervals

Maintenance point
Annually
Entire battery storage system
Lithium-ion batteries
Update the
displayed State
of Health
AC unit
Smoke detector
Doors
Special maintenance intervals
Electrical
equipment

Tab. 4: Maintenance intervals

102
Carry out a visual inspection,
check screw connections
Visual inspection
As per description
As per specifications
from INTILION GmbH
As per supplier
specifications
As per description
Safety inspection
9.2 Inspection and maintenance work
9.2.3.
3
9.2.3.
4
9.2.3.
5
9.2.3.
6
9.2.4
9 Maintenance
9.2.3.1
9.2.3.2
INTILION GmbH

Advertisement

Table of Contents
loading

Table of Contents