Routing The Cable Assembly - Precor Discovery Selectorized Series Assembly Manual

Shoulder press
Hide thumbs Also See for Discovery Selectorized Series:
Table of Contents

Advertisement

Routing the Cable Assembly

The cable is wrapped in packing material and attached to the equipment frame
for shipment. Proper cable routing is shown in the following figure.
The cable is attached to the movement frame, but you will need to route it on
the pulleys.
The following graphic displays proper routing of the cable on the pulleys.
Figure 7: Cable routing on movement frame
Shoulder Press Assembly Guide: Routing the Cable Assembly
To route the cable on the movement frame pulleys:
1. Using a Phillips screwdriver, remove the screws holding the plastic covers
on the pulleys.
Figure 8: Pulley cover screw location
2. Using a ³ ₈-inch hex bit and a ³ ₄-inch socket wrench, remove the pulley,
bolt, locknut and two washers.
Figure 9: Pulley removal
7