Routing the Cable Assembly

The cable is wrapped in packing material and attached to the equipment frame
for shipment. Proper cable routing is shown in the following figure.
Figure 14: Correct cable routing on movement frame
If necessary, unscrew the cable bolt from the rod end (see figure in step 3) and
use the following procedure to restore the cable to its original route.
Seated Row Assembly Guide: Routing the Cable Assembly
To route the cable on the movement frame:
1. Using a Phillips screwdriver, remove the screw holding the plastic pulley
cover in place, and remove the cover.
Figure 15: Location of cover screw
2. Using a ³ ₈-inch hex tip and a ³ ₄-inch socket wrench, remove pulley, bolt,
locknut, and two washers.