Routing The Cable Assembly; Routing The Cable On The Weight Tower - Precor Discovery Series Selectorized Line Owner's Manual

Fitness equipment
Hide thumbs Also See for Discovery Series Selectorized Line:
Table of Contents

Advertisement

Routing the Cable Assembly

The cable is wrapped in packing material and attached to the equipment frame
for shipment. Proper cable routing is shown in the following figure.
Figure 7: Proper cable routing
If necessary, use the following procedure to restore the cable to its original
route.
To route the cable on the movement frame:
1. Using a #2 Phillips bit, remove the screws on the pulley cover.
2. Route the cable over the pulley as shown in preceding figure.
3. Replace the pulley cover and screws. Tighten to 10 in-lb (1 N-m) of torque.
Glute Extension Assembly Guide: Routing the Cable Assembly

Routing the Cable on the Weight Tower

The weight tower ships with the kick cover and pulley cover attached.
To route the cable on the weight tower:
1. Using a ⁵ ₃₂-inch hex bit, remove the screw and pulley cover and set them
aside.
Figure 8: Kick plate pulley cover removal
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents