Will Burt Stiletto AL 4-Meter Operating Instructions Manual page 90

Table of Contents

Advertisement

S
AL O
I
TILETTO
PERATING
NSTRUCTIONS
De-Energized! Always ensure all electrical circuits to the Mast System are de-energized and
properly tagged and locked out prior to performing maintenance or repair procedures.
Remove Payload! Remove payload before performing maintenance on the Mast System.
Safety Instruction – Observe Proper Procedures! Use extreme caution while lifting the Mast
System and when Mast System is suspended to avoid injury and equipment damage. Be certain
the Mast System is properly secured. All operators should be aware of and follow the applicable
local, regional, and national standards and codes of practice for slinging and transporting
equipment. Never lift Mast System over people. Ensure lifting equipment including, but not
limited to, lifting straps and hoist, are capable of handling the forces generated from lifting the
system. Observe manufacturer instructions on lifting equipment. Death or serious injury could
result if proper procedures are not followed.
Disconnect Power! Power must be disconnected before connecting or disconnecting any Mast
System connector. For example, power must be disconnected when connecting or
disconnecting J1, J2, J3, and J4 on the Control Box. Do not disconnect the power cable from J1
on the Control Box or from the power source while the mast is in motion (extending or
retracting). This could result in damage to the Control Box.
5-2
Original Instructions
TP-5418901-F
August 2020

Advertisement

Table of Contents
loading

Related Products for Will Burt Stiletto AL 4-Meter

Table of Contents