Voltage and Current! Verify that a power source capable of delivering the specified Mast
System voltage and current has been properly connected to the Control Box. Damage to the
Control Box may occur if voltage drops below 18 volts during operation of the mast. Do not
disconnect the power cable from J1 on the Control Box or from the power source while the mast
is in motion (extending or retracting). This could result in damage to the Control Box.
Polarity! Ensure the electrical mains polarity is correct before initializing the Mast System.
3.2 Operation Equipment
Table 3-1 lists recommended equipment for operation.
Personal Protective
Safety Glasses
Hearing Protection
Hand Tools
Crank Handle Assembly (P/N: A3209918) (For manual operation only.)
* Depending on the local, regional, and national standards and codes of practice, and the environment, additional
personal protective equipment may be necessary.
TP-5418901-F
August 2020
Table 3-1 Equipment Recommended for Operation
Recommended Equipment*
Work Gloves
Hard Hat or Helmet
Original Instructions
S
AL O
TILETTO
PERATING
Nitrile or Vinyl Gloves
Safety Shoes
I
NSTRUCTIONS
3-3