Section 1 Introduction & Intended Use - Will Burt Stiletto AL 4-Meter Operating Instructions Manual

Table of Contents

Advertisement

Section 1
Review this manual in its entirety. Contact The Will-Burt Company with any questions before
performing any procedure outlined in this manual. The views depicted in this manual are
provided for clarification and are subject to change without notice. Views are not to scale.
This manual describes installation, operation, transportation, maintenance, storage, and
troubleshooting procedures for the Stiletto AL Mast System. These procedures assume the use
of standard catalog Mast Systems. Procedures and characteristics for Mast Systems
customized to meet customer-specific needs may vary.
This manual is for the following Stiletto masts:
4-Meter Stiletto AL
6-Meter Stiletto AL
8.54-Meter Stiletto AL
10-Meter Stiletto AL
15-Meter Stiletto AL
This manual is not for the following masts:
Stiletto (3, 4, 6, 10 or 15-Meter)
Stiletto HD (4, 6, or 10-Meter)
See
www.willburt.com
A typical Stiletto AL Mast System consists of:
A telescoping mast with a 28 VDC Drive Assembly and a Support Bracket Assembly
Universal Control Box
Optional Accessories
The Stiletto AL mast system is intended to be installed and operated by trained professionals to
elevate critical payloads. It is not intended for use by non-professionals. The Stiletto AL mast is
designed to lift a specific payload for lighting, surveillance, or communication use only. Do not
use the mast to lift personnel. The mast is intended for stationary use. Contact The Will-Burt
Company with any questions on the intended use, special on-the-move use for military
applications only, or available training programs for installation and operation.
TP-5418901-F
August 2020
Introduction & Intended Use
for information on these and other Will-Burt products.
Original Instructions
S
AL O
TILETTO
PERATING
I
NSTRUCTIONS
1-1

Advertisement

Table of Contents
loading

Related Products for Will Burt Stiletto AL 4-Meter

Table of Contents