2. Plug the 24-pin Mast Sensor Cable into bulkhead connector J2 on the Universal Control
Box and bulkhead connector J6 at the base of the mast. Screw both connectors in place
so that the cable is secure.
3. Plug the 4-pin Motor and Brake Cable into bulkhead connector J3 on the Universal
Control Box and bulkhead connector J5 on top of the Motor. Screw both connectors in
place so that the cable is secure.
4. Depending on the Mast System configuration, a data cable may be used. For example, a
data cable is used with optional components including the Hand-Held Remote, PC
Interface, or D-TEC.
If used, plug in the 8-pin data cable to bulkhead connector J4. Screw the connector in
place so that the cable is secure.
If not used, ensure the dust cap to J4 is installed and secure.
2-20
I
NSTRUCTIONS
Figure 2-9 Universal Control Box Schematic (Revision M)