Section 3 Operation; Pre-Operation Check - Will Burt Stiletto AL 4-Meter Operating Instructions Manual

Table of Contents

Advertisement

Section 3
This section describes operation of the Mast System. The exact operating procedures will vary
based on the configuration of your Mast System. Follow the appropriate operation procedures
for your Mast System. This section assumes the mast is not guyed. See Section 9.2 for
information pertaining to guying of the mast. Use care to understand and follow all precautions
while operating.

3.1 Pre-Operation Check

Before operating the system, ensure:
All operators read and understand the entire operation procedure
The Mast System is properly installed and undamaged.
The payload is properly installed. The payload should be bolted to the mast using the six
M8x1.25 threaded holes in the top of the Top Tube Ring with high strength bolts and the
appropriate thread locker. The six 8.2mm through holes on the side can be used for
additional bolts, quick release pins or a tether for additional payload security. Please
contact Will-Burt Engineering to determine if your application requires these precautions.
The Mast System is undamaged. If damage is apparent, do not use the Mast System,
and have it serviced prior to use.
All electrical cables are undamaged and properly terminated.
All payload cables are not tangled and are free to pay out as the mast extends.
Any transit tie-downs on the payload have been removed.
The area is free of power lines or other overhead obstructions. The Mast System
location should be no closer than a horizontal distance equal to the extended height of
the mast away from power lines.
When using a vehicle, that the vehicle is not moving and is on level terrain. The mast
can be operated on terrain having a slope up to:
o 10° for the 4-Meter, 6-Meter, 8.54-Meter, and 10-Meter
o 5° for the 15-Meter
The Mast System area is free of personnel.
The operator has full view of the Mast System during use.
Ensure that the following precautions are understood and followed:
Trained Personnel Only! Only trained and qualified personnel should perform operating
procedures. Deviation from standard operating conditions and procedures could cause
dangerous Mast System failure.
TP-5418901-F
August 2020
Operation
Original Instructions
S
AL O
TILETTO
PERATING
I
NSTRUCTIONS
3-1

Advertisement

Table of Contents
loading

Related Products for Will Burt Stiletto AL 4-Meter

Table of Contents