Installing Engine - Volkswagen CC 2012 Workshop Manual

6-cylinder direct-injection engine (3.6 l engine, 4v)
Hide thumbs Also See for CC 2012:
Table of Contents

Advertisement

Secure engine on the engine and gearbox support - VAS 6095-
using universal mounting.
Secure engine on the engine and gearbox support - 3269- with
engine bracket - VAS 6095- .
1.4

Installing engine

Install in reverse order of removal, observing the following.
Caution
Observe the following during all assembly work, particularly in
the engine compartment due to the restricted space:
♦ Route lines of any kind and cables so that original routing
is restored.
♦ Ensure that there is sufficient clearance to all moving or
hot components.
– When installing the engine and gearbox assembly, make sure
there is sufficient clearance to the subframe and radiator.
– Align engine mountings as follows:
CC 2012 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤
6-cylinder direct-injection engine (3.6 l engine, 4V) - Edition 06.2019
1. Removing and installing engine
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Passat 2011Passat variant 2011

Table of Contents