Volkswagen CC 2012 Workshop Manual page 185

6-cylinder direct-injection engine (3.6 l engine, 4v)
Hide thumbs Also See for CC 2012:
Table of Contents

Advertisement

Removing:
Note
Note safety precautions before starting installation work
⇒ page 4
.
Observe rules for cleanliness
If the fuel rail is removed, the injector O-ring, support washer,
spring element and combustion chamber seal must always be
renewed
⇒ page 170
With the injectors for cylinders 1, 3 and 5, also renew the seal
⇒ Item 4 (page 165)
Assembly overview - fuel rail with high-pressure pump and in‐
jectors
⇒ page 162
.
Assembly overview - intake manifold
Caution
Observe the following during all assembly work, particularly in
the engine compartment due to the restricted space:
♦ Route lines of any kind and cables so that original routing
is restored.
♦ Ensure that there is sufficient clearance to all moving or
hot components.
– Disconnect earth strap at battery with ignition switched off ⇒
Electrical system; Rep. gr. 27 ; Battery; Disconnecting and
connecting battery .
– Remove noise insulation ⇒ General body repairs, exterior;
Rep. gr. 66 ; Noise insulation; Assembly overview - noise in‐
sulation .
– Remove upper part of intake manifold
– Remove high-pressure pump
– Remove connecting pipe of fuel rail -arrows-.
CC 2012 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤
6-cylinder direct-injection engine (3.6 l engine, 4V) - Edition 06.2019
⇒ page 6
.
.
.
⇒ page 176
⇒ page 181
⇒ page 195
.
.
.
179
4. Intake manifold

Advertisement

Table of Contents
loading

This manual is also suitable for:

Passat 2011Passat variant 2011

Table of Contents