Removing And Installing Intake Manifold Upper Part - Volkswagen CC 2012 Workshop Manual

6-cylinder direct-injection engine (3.6 l engine, 4v)
Hide thumbs Also See for CC 2012:
Table of Contents

Advertisement

– Install connecting pipe of fuel rail.
Note
First tighten union nuts for connection pipe hand tight, then
tighten to specified torque.
Make sure that the connecting pipe does not touch any other
components.
– Installing high-pressure pump
– Install upper part of intake manifold
Bolted connection
Intake manifold lower part to
cylinder head
Fuel rail to cylinder head
High-pressure pump to cylinder
head
Union nuts for high-pressure
fuel line
Union nuts for fuel rail connect‐
ing line
4) Renew
4.3
Removing and installing intake manifold
upper part
Special tools and workshop equipment required
♦ Torque wrench - V.A.G 1331-
♦ Assembly tool - T10118-
CC 2012 ➤ , Passat 2011 ➤ , Passat Variant 2011 ➤
6-cylinder direct-injection engine (3.6 l engine, 4V) - Edition 06.2019
⇒ page 195
.
⇒ page 181
Torque setting
8 Nm
1
4)
30 Nm + 90° (
/ 4 turn) further
10 Nm
28 Nm
28 Nm
.
181
4. Intake manifold

Advertisement

Table of Contents
loading

This manual is also suitable for:

Passat 2011Passat variant 2011

Table of Contents