Komatsu PC500LC-10R Shop Manual page 429

Hydraulic excavator
Table of Contents

Advertisement

30 TESTING AND ADJUSTING
REMARK
If the swing lock switch is turned on, the main relief valve is set for high-pressure relief.
12. Turn the fuel control dial to MAX (High idle) position.
13. Test the boost pressure when the oil pressure is relieved in arm IN circuit + one-touch power maximizing is
ON by operating the work equipment control lever.
For standard values, see the "Gauge pressure" in STANDARD VALUE TABLE, "STANDARD VALUE TABLE
FOR ENGINE".
REMARK
• "Charge Pressure" on the monitoring is displayed in absolute value.
• The absolute pressure includes the atmospheric pressure. Check the atmospheric pressure because it
changes with altitude.
• The relationship between the absolute pressure and the gauge pressure is as follows.
Gauge pressure = Absolute pressure - Ambient pressure
Remove the testing tools and restore the machine after the test is finished.
3
Boost pressure pickup plug (1): 
2.0±3.9 Nm {0.2±0.4 kgm} 
2
Boost pressure pickup plug (1): 
Liquid adhesive (LS-2)
PC500LC-10R
TEST BOOST PRESSURE
30-23

Advertisement

Table of Contents
loading

Table of Contents