3.3.3 Setting flow chart

This configuration setting flow shall be utilized, when
CASE 1) USDA transportation setting is required (※10 Optional Function Setting)
CASE 2) Container ID shall to be subjected to change from another container for emergency use.
(※13 Container ID & Time Setting)
CASE 3) Controller is replaced to new one. (All setting in ※10-13 should be set on page 3-25.)
NOTE 1 : All initial settings are pre-setted, when the unit is delivered.
2 : In case to complete the setting change, CIRCUIT BREAKER shall be turned off
Power OFF
Circuit Breaker ON
Unit OFF
I/O ON
All lights on
(for 3 sec.)
for 3 sec.
for 3 sec.
Preparation
(for 18 sec.)
USDA: OFF (or 3 or 4)
S
dHU: OFF (or ON)
CASE 1
for 3 sec.
※ 10
PTI
Optional
Function
Setting
DECOS3: C (or B or A)
S
Log. Interval: 30 (or 15 or 60 or 120)
S
REC SEN: ON (or OFF)
S
OC-SET: Sing (or Dual)
S
HP: 10 (or 5)
S
DISP: OFF (or ON)
S
COMP: 100 (or 33)
S
REHEAT: OFF (or ON)
CASE 3 (Refer to clause 3.8.2)
Circuit Breaker OFF
after setting change
(
I/O
OFF when no setting changed)
for 3 sec.
for 3 sec.
※ 11
Basic
Function
Setting
CHARTLS: OFF (or ON)
S
USDA 1/2: 2 (or 1)
S
H001~H006
S
d-1**~d-2**
S
C/F : C (or F)
3-24
for 3 sec.
※ 12
※ 13
Optional
Input Data
Condition
Setting
Container I.D
S
Controller
Time
CASE 2