Daikin LXE10E-A Service Manual page 234

Marine type container refrigeration unit
Table of Contents

Advertisement

https://daikin-p.ru
●Caution on the service work
qBe sure not to bend the refrigerant pipe
when turning the hose joint.
wThe remaining pressure in the charge hose
may cause installation failure. In this case,
try it again after relieving the pressure in
the hose.
Liquid receiver
Fusible plug
Service port (High pressure)
Low-pressure side hose
Compound gauge
Service port (Low pressure)
Pressure
gauge
8-51
Hose for air purge
and refrigerant charge
Structure of gauge manifold
Open state
Open and closed states of gauge manifold
(2) Removal of gauge manifold
Remove the gauge manifold with turning the
joint A by hand.
CAUTION
Be sure to attach the cap to the
service port after the removal of the
manifold.
Gauge manifold
Passage open-
/closing cock
High-pressure
side hose
Closed state
A

Advertisement

Table of Contents
loading

Table of Contents