Chapter 6 Preparation And Inspection - FujiFilm PB-30 Operation Manual

Balloon controller
Table of Contents

Advertisement

Chapter 6 Preparation and Inspection

Chapter 6 Preparation and Inspection
Introduction
1
Connect an external monitor to PB-30 as necessary.
2
Connect the filter and tube to the main unit.
3
Install PB-30 onto the cart and connect the remote
switch.
4
Connect PB-30 and the endoscope.
5
Inspect the functions of PB-30.
6
Install the foot switch as necessary.
28
The workflow before using this product is shown below. Refer to each section by following
this flowchart.
"6.1 Connecting PB-30 and an External Monitor"
"6.2.1 Inspecting the Filter and Tube"
"6.2.3 Connecting the Filter and Tube to the Main
Unit"
"6.3 Installation of PB-30"
"6.4 Connecting PB-30 and the Endoscope"
"6.5.1 Inspecting the Functions of the Pump and the
Balloon"
"6.5.2 Inspecting the Pressure Control Mechanism"
"6.6 Installation and Operation of Foot Switch"

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents